Operations

Operations Home

Green Hall South Parking Lot and Allison Hall Pedestrian Closures

June 1, 2019 through July 31, 2019

The Green Hall parking lot on the south side of the Scott Bioengineering Building will be partially closed while under construction. The sidewalk west of Allison Hall to Plum Street will also be closed.

Limited parking is available in the lot on the west side, close to Meridian Avenue. Permit holders with an A designation will be able to park in Q-designated areas of this lot during construction.

Need help with your email signature?

This summer, we are making sure that our communications within the college are close to the university’s brand guidelines.

We’ve created a simple version of our branded e-mail signature below, just copy and paste the information between the lines into your e-mail program and customize it as needed.