City of Fort Collins Utilities: DWRF Bio Towers Repurpose
Project ID: 4
Students:
Khaled Alajmi, Medeth Alajmi, Abdullah Alzoubi, Wilson Riley, Ethan Sicat, Marc Smoorenburg, Scott Sundheim, Jacob Van Ens, Gavin Vonalt,
Details and presentations
The objective of this project is to retrofit the defunct biotowers at the Drake Water Reclamation Facility to enhance nutrient removal, particularly phosphorus and nitrogen, to meet upcoming Colorado regulations. The project focuses on repurposing existing infrastructure to support biofilm or microbial growth that can biologically assimilate these nutrients from municipal wastewater. Laboratory experiments and simulations will be conducted to identify a technically feasible and economically viable bioreactor
configuration capable of operating under variable conditions. Overall, the goal is to develop a cost-effective, sustainable solution that improves effluent quality without requiring significant new infrastructure investments.
Department:
Department of Chemical and Biological Engineering
Advisors:
Jan Harris (City of Fort Collins Utilities), Mandy Rasmussen (City of Fort Collins Utilities), Christina Schroder (City of Fort Collins Utilities), Kelly Wasserbach (City of Fort Collins Utilities), Dr. Christie Peebles (CSU), Dr. Rebecca Atedero (CSU)