1. Meroney, R.
N. (1963), EXPERIMENTAL INVESTIGATION OF THE EFFECTS OF MASS INJECTION ON HEAT
TRANSFER FROM A PARTIALLY DISSOCIATED BOUNDARY LAYER, Institute of Engineering
Research, University of California, Berkeley, Report No. AS636, 1963,
CER63RNM78.
2. Meroney,
R. N., et al. (1964), THE STUDY OF BASE HEATING BY RADIATION FROM EXHAUST
GASES, Final Report NASA Contract No. NAS8850, University of
3. Meroney,
R. N. (1965), THE EFFECT OF MASS INJECTION ON HEAT TRANSFER FROM A PARTIALLY
DISSOCIATED GAS STREAM, Ph.D. Thesis, Mechanical Engineering Department,
University of California, Berkeley, May 1965, CER66-67RNM10.
4. Meroney,
R. N., et al. (1966), SIMULATION OF ATMOSPHERIC MOTION BY WIND TUNNEL FLOWS,
Colorado State University, Fluid Dynamics and Diffusion Laboratory Technical
Report, May 1966, CER66-17, AD-633-584.
5. Meroney,
R. N. and Ostrowski, J. (1967), PRELIMINARY EXAMINATION OF HEAT AND MASS
TRANSFER TO STACKED GREEN LUMBER IN DRYING KILNS, Fluid Dynamics and Diffusion
Laboratory Report CER66-67RNM-JO31, January 1967.
6. Meroney,
R. N. and Cermak, J. E. (1966), WIND TUNNEL MODELING OF FLOW AND DIFFUSION OVER
7. Meroney,
R. N., Cermak, J. E., and Chaudhry, F. H. (1968), WIND TUNNEL MODEL STUDY OF
SHOREHAM NUCLEAR POWER STATION UNIT I, LONG ISLAND LIGHTING COMPANY, Progress
Report No. 1, July 1968, CER68-69RNM-JEC-FHC1.
8. Meroney,
R. N., Kesic, D., and Yamada, T. (1968), GASEOUS PLUME DIFFUSION
CHARACTERISTICS WITHIN MODEL PEG CANOPIES, July 1968, CER68-69RNM-DK-TY3.
9. Meroney,
R. N. and Kawatani,* T. (1968), STRUCTURE OF CANOPY FLOW FIELD,
September 1968, CER68-69TK-RNM13.
10. Meroney, R. N., Cermak, J. E., and
Chaudhry, F. H. (1968), WIND TUNNEL MODEL STUDY OF SHOREHAM NUCLEAR POWER
STATIONS UNIT 4, LONG ISLAND LIGHTING COMPANY, Progress Report 2,
CER68-69RNM-JEC-FHC14, October 1968, Part 2 of CER68-69RNM-JEC-FHC1.
11. Meroney, R. N. and Veenhuizen,*
D. (1969), SECONDARY FLOW IN A BOUNDARY LAYER, Project THEMIS Technical Report
No. 3, June 1969, CER68-69SDV-RNM28.
12. Meroney, R. N. and Chaudhry,*
F. H. (1969), TURBULENT DIFFUSION IN A STABLY STRATIFIED SHEAR LAYER - TASK B
RESEARCH TECHNICAL REPORT DESERT TEST CENTER, September 1969,
CER69-70FHC-RNM12, AD-699-374.
13. Meroney, R. N. (1970), GASEOUS PLUME
DIFFUSION ABOUT ISOLATED STRUCTURES OF SIMPLE GEOMETRY, Annual Progress Report,
June 15, 1969-June 14, 1970, AEC Report No. COO-2053-1.
14. Meroney, R. N. and Symes, C. R. (1969),
SUPPLEMENT TO REPORT ON BALLOON SHELTER TESTS, Prepared for
15. Meroney, R. N., Plate, E. J., and Symes,
C. R. (1970), WIND TUNNEL INVESTIGATION OF SHAPES FOR BALLOON SHELTERS, Final
Report prepared for National Center for Atmospheric Research, July 1970,
Combination of CER68-69-44 and CER68-6944a.
16. Meroney, R. N., Cermak, J. E., Yang, B.
T., Vennhuizen, S., and Symes, C. R. (1969), WIND TUNNEL MODEL STUDY OF
DIFFUSION FROM A STEAM ELECTRIC GENERATING PLANT AT STOCK ISLAND, KEY WEST,
FLORIDA, Prepared under contract to R. W. Beck and Associates, Denver,
Colorado, August 1969, Revised December 1969, CER69-70RNM-JEC-BTY-SV-CRS14.
17. Meroney, R. N., Cermak,* J.
E., Garrison, J. A., Nickerson, E. C., Plate, E. J., Sadeh, W. Z. (1969), WIND
TUNNEL STUDIES AND SIMULATIONS OF TURBULENT SHEAR FLOWS RELATED TO ATMOSPHERIC
SCIENCE AND ASSOCIATED TECHNOLOGIES, ECOM Report No. 4, First Annual Report, June
30, 1969, Prepared for U.S. Army Electronics Command, Contract
DAAB07-68-C-0423.
18. Meroney, R. N. and Yang,* B.
T. (1969), WIND TUNNEL STUDIES OF THE AIR FLOW AND GASEOUS PLUME DIFFUSION IN
THE LEADING EDGE AND DOWNSTREAM REGIONS OF A MODEL FOREST, Technical Report,
Contract No. DCAAB07-68-C-0423, November 1969, CER69-70RNM-BTY17, AD-703-892.
19. Meroney, R. N. and Yang,* B.
T. (1970), GASEOUS DISPERSION INTO STRATIFIED BUILDING WAKES, AEC Report No.
COO-2053-3, August 1970, CER70-71BTY-RNM8.
20. Meroney, R. N. and Symes,* C.
(1970), CONE FRUSTUMS IN A SHEAR LAYER, AEC Report No. COO-2053-5, August 1970,
CER70-71CRS-RNM11.
21. Meroney, R. N., Haberstroh, R. D., and
Kim, I. K. (1970), INFLUENCE OF ABSOLUTE PRESSURE ON THE COOLING OF A PLATE BY
IMPINGING AIR JETS, September 1970, CER70-71-RNM-IKK26.
22. Meroney, R. N., Haberstroh,*
R. D., and Kim,
23. Meroney, R. N. and Yamada,* T.
(1971), NUMERICAL AND WIND TUNNEL SIMULATION OF RESPONSE OF STRATIFIED SHEAR
LAYERS TO NONHOMOGENEOUS SURFACE FEATURES, June 1971, CER70-71TY-RNM62,
AD-730-953.
24. Meroney, R. N. and Anyiwo,* J.
C. (1971), AN EFFECTIVE-VISCOSITY MODEL FOR TURBULENT WALL BOUNDARY LAYERS,
Project THEMIS Technical Report No. 10, June 1971, CER70-71JCA-RNM63,
AD-731-061.
25. Meroney, R. N. and Anyiwo,* J.
C. (1972), A COMPUTER STUDY OF TRANSITION OF WALL BOUNDARY LAYERS, NSF Grant
#GK-23989, January 1972, CER71-72JCA-RNM21.
26. Meroney, R. N. and Yang, B. T. (1971),
WIND TUNNEL STUDY ON GASEOUS MIXING DUE TO VARIOUS STACK HEIGHTS AND INJECTION
RATES ABOVE AN ISOLATED STRUCTURE, AEC Report COO-2053-6, November 1971,
CER71-72RNM-BTY16.
27. Meroney, R. N. (1971), GASEOUS PLUME
DIFFUSION ABOUT ISOLATED STRUCTURES OF SIMPLE GEOMETRY--FINAL REPORT, AEC
Report COO-2053-7, December 1971, CER71-72RNM19.
28. Meroney, R. N. and Kahawita,*
R. A. (1972), PENETRATIVE CONVECTIVE INSTABILITIES IN PARALLEL FLOWS, Project
THEMIS Report No. 13, Prepared under Office of Naval Research Contract No.
NOOO14-68-A-0493-0001, May 1972, CER71-72RAK-RNM24.
29. Meroney, R. N. and Chaudhry, F. H.
(1972), WIND TUNNEL SITE ANALYSIS OF DOW CHEMICAL FACILITY AT ROCKY FLATS,
COLORADO, Research and Ecology, Rocky Flats Division, Dow Chemical Company, May
1972, CER71-72RNM-FC45.
30. Meroney, R. N. and Yang,* B.
T. (1972), ON DIFFUSION FROM AN INSTANTANEOUS POINT SOURCE IN A NEUTRALLY
STRATIFIED TURBULENT BOUNDARY LAYER WITH A LASER LIGHT SCATTERING PROBE,
Project THEMIS Technical Report No. 20, October 1972, CER72-73BTY-RNM17.
31. Meroney, R. N. and Kawahita,*
R. A. (1973), THE STABILITY OF PARALLEL, QUASI PARALLEL AND STATIONARY FLOWS,
Project THEMIS Technical Report No. 24, September 1973, CER73-74RAK-RNM12,
AD-770-883.
32. Meroney, R. N., Peterka, J. A., and Hoot,
T. (1972), WIND TUNNEL SITE ANALYSIS OF DOW CHEMICAL FACILITY AT ROCKY FLATS,
COLORADO, PART II, March 1972, CER72-73RNM-JAP-TGH16.
33. Meroney, R. N., Hoot,* T. B.,
and Peterka, J. A. (1973), WIND TUNNEL TESTS OF NEGATIVELY BUOYANT PLUMES,
October 1973, CER73-74TGH-RNM-JAP13.
34. Meroney, R. N. (1973), REPORT ON
ACTIVITIES DURING TENURE OF AIR POLLUTION FELLOWSHIP FROM THE ENVIRONMENTAL
PROTECTION AGENCY UNDER THE CLEAN AIR ACT (P.L. 88206), October 1973,
CER73-74RNM15.
35. Meroney, R. N., Cermak, J. E., Garrison,
J. A., Yang, B. T., and Nayak, S. (1974), WIND TUNNEL STUDY OF STACK GAS
DISPERSAL AT THE AVON LAKE POWER PLANT, Prepared under contract to Commonwealth
Associates, Inc., April 1974, CER73-74RNM-JEC-BTY-SKN35.
36. Meroney, R. N. (1974), MEASUREMENTS OF
TURBULENT BOUNDARY LAYER GROWTH OVER A LONGITUDINALLY CURVED SURFACE, Project
THEMIS Tech. Report No. 25, Prepared under ONR Contract No.
NOOO14-68-A-0493-0001, and
also appears as Imperial College of
Science and Technology, Dept. of Aero. Rep. 1C, Area Rept. 74-05, January 1974,
CER73-74RNM26.
37. Meroney, R. N. (1974), BUOYANCY EFFECTS
ON A TURBULENT SHEAR FLOW, THEMIS Report No. 28, June 1974, CER73-74RNM38.
38. Meroney, R. N., Cermak, J. E., Connell,
J. R., and Garrison, J. A. (1974), WIND ENGINEERING STUDY OF ATMOSPHERIC
DISPERSION OF AIRBORNE MATERIALS RELEASED FROM A FLOATING NUCLEAR POWER PLANT,
Offshore Power Systems, Westinghouse-Tenneco, Jacksonville, Florida, August
1974, CER74-75RNM-JEC-JRC-JAG4.
39. Meroney, R. N. (1974), NUMERICAL AND
PHYSICAL MODELS OF URBAN HEAT ISLANDS-FINAL REPORT, NSF Grant ENG-72-03938,
December 1974, CER74-75RNM26.
40. Meroney, R. N. (1974), LAMINAR/TURBULENT
TRANSITION TRANSPIRED BOUNDARY LAYERS - FINAL REPORT, NSF Grant ENG-70-01360,
December 1974, CER74-75RNM27.
41. Meroney, R. N., Cermak, J. E., and
Garrison, J. A. (1975), WIND TUNNEL STUDY OF STACK GAS DISPERSAL AT
42. Meroney, R. N., Cermak, J. E., and
Garrison, J. A. (1975), WIND TUNNEL STUDY OF STACK GAS DISPERSAL AT WELSH POWER
STATION UNITS 1, 2, and 3, for Sargent andLundy Engineers, Chicago, April 1975,
CER74-75RNM-JEC-JAG49.
43. Meroney, R. N., Cermak, J. E., Hill, D.,
and Garrison, J. A. (1975), WIND-TUNNEL MODEL STUDY OF DIFFUSION - COALPLEX
PROJECT, A.E. and C.I. Limited, South Africa, July 1975, CER75-76RNM-JEC-JAG3.
44. Meroney, R. N. and Burke,* B.
L. (1975), ENERGY FROM THE WIND, Solar Energy Applications Laboratory,
45. Meroney, R. N., Peterka, J. A., and
Cermak, J. E. (1975), WIND TUNNEL STUDY OF STEAM TRANSPORT AND WIND FORCES FOR
A FLOATING NUCLEAR POWER PLANT, for Offshore Power Systems,
46. Meroney, R. N. and Cermak, J. E. (1976),
WIND TUNNEL STUDY OF STACK GAS DISPERSAL AT HARRINGTON POWER STATION, Prepared
for Southwestern Public Service Company,
47. Meroney, R. N., Sandborn, V. A.,
Bouwmeester, R. J. B., and Rider, M. A (1976)., SITES FOR WINDPOWER
INSTALLATIONS: Wind Tunnel Simulation of
the Influence of Two-Dimensional Ridges on Wind Speed and Turbulence, NSF/RANN
GAER 75-00702, July 1976, CER76-77RNM-VAS-RB-MAR5.
48. Meroney, R. N. and Cermak, J. E., WIND
TUNNEL STUDY OF STACK GAS DISPERSAL AT HARRINGTON POWER STATION: UNIT III, Prepared for Southwestern Public
Service Company,
49. Meroney, R. N., Cermak, J. E., and Neff,
D. E. (1976), WIND TUNNEL STUDY OF THE NEGATIVELY BUOYANT PLUME DUE TO AN LNG
SPILL, Prepared for R & D Associates, Marina del Rey, California, November
1976, CER76-77RNM-JEC-DEN22.
50. Meroney, R. N., Sandborn, V. A.,
Bouwmeester, R. J. B., and Rider, M. A. (1976), SITES FOR WIND POWER
INSTALLATIONS - TABULATED EXPERIMENTAL DATA, Progress Report, June-November
1976, ERDA/Y-76-S-06-2438/76/1, 57pp., CER76-77RNM-VAS-RB-MAR29.
51. Meroney, R. N., Hatcher,* R.
V., Peterka, J. A., and Kothari, K. (1977), DISPERSION IN THE WAKE OF A MODEL
INDUSTRIAL COMPLEX, Prepared for Nuclear Regulating Commission, June 1977,
CER76-77RVH-RNM-JAP-KK35.
52. Meroney, R. N., Neff, D., Cermak, J. E.,
and Megahed, M. (1977), DISPERSION OF VAPOR FROM LNG SPILLS - SIMULATION IN A
METEOROLOGICAL WIND TUNNEL -PART II, Prepared for R & D Associates, Marina
del Rey, California, May 1977, CER76-77RNM-JEC-DEN-MM57.
53. Meroney, R. N., Petersen,* R.
L., and Cermak, J. E. (1977), PLUME RISE AND DISPERSION - EFFECTS OF EXIT
VELOCITY AND ATMOSPHERIC STABILITY, Prepared under contract to North American
Weather Consultants, June 1977, CER76-77RLP-JEC-RNM59.
54. Meroney, R. N., Sandborn,* V.
A., Bouwmeester, R. J. B., and Rider (1977), M. A., SITES FOR WIND POWER
INSTALLATION: Wind Tunnel Simulation of
the Influence of Two-Dimensional Ridges on Wind Speed and Turbulence,
"Final Report:Second Year," ERDA Report RLO/243877/1, July 1977,
CER77-78RNM-VAS-RB-MAR6, 186 pp.
55. Meroney, R. N., Peterka, J. A., and
Kothari, K. M. (1978), WIND TUNNEL MEASUREMENTS OF DISPERSION AND TURBULENCE IN
THE WAKES OF NUCLEAR REACTOR PLANTS, Annual Report Jan. 67-Aug. 78, Office of
Nuclear Regulatory Research, NRC Contract No. AT(49-24)-0366, July 1978,
CER78-79RNM-JAP-KMK4, 26pp.
56. Meroney, R. N., Allwine,* K.
J., and Peterka, J. A. (1978),
57. Meroney, R. N., Bouwmeester,*
R. J. B., Sandborn, V. A. (1978), SITES FOR WIND POWER INSTALLATIONS: WIND CHARACTERISTICS OVER RIDGES: FINAL REPORT PART I, Department of Energy
Contract No. EY-76-S-06-2438, A001, Report RLO/2438-77/1, June 1978,
CER77-78RJBB-RNM-VAS-S1.
58. Meroney, R. N., Bowen, A. J., Lindley,
D., and Pearse, J. (1978), WIND CHARACTERISTICS OVER COMPLEX TERRAIN: LABORATORY SIMULATION AND FIELD MEASUREMENT
AT RAKAIA GORGE, NEW ZEALAND, FINAL REPORT, PART II, Department of Energy
Contract No. EY-76-S-06-2438, A001, 219 pp., Report RLO/2438-77/2, 219 pp., May
1978, CER77-78RNM29.
59. Meroney R. N., Sandborn, V. A., Bouwmeester,
R. J. B., Chien, H. C., and Rider, M. (1978), SITES FOR WIND POWER
INSTALLATIONS: PHYSICAL MODELING OF THE
INFLUENCE OF HILLS, RIDGES AND COMPLEX TERRAIN ON WIND SPEED AND TURBULENCE: Part II:
Executive Summary, Department of Energy Contract No. EY-78-S-06-2438,
A001, Report RLO/2436-77/3, June 1978, 91 pp., CER77-78RNM-VAS-RJBB-HCC-MR50a.
60. Meroney, R. N., Sandborn, V. A.,
Bouwmeester, R. J. B., Chien, H. C., and Rider, M. (1978), SITES FOR WIND POWER
INSTALLATIONS: PHYSICAL MODELING OF THE
INFLUENCE OF HILLS, RIDGES AND COMPLEX TERRAIN ON WIND SPEED AND
TURBULENCE: Final Report Part II: Appendix, Department of Energy Contract No.
EY-76-S-06-2438, A001, Report RLO/2438-77/3, June 1978,
CER77-78RNM-VAS-RJBB-HCC-MR50b.
61. Meroney R. N. and Neff,* D. E.
(1979), DISPERSION OF VAPOR FROM LNG SPILLS--SIMULATION IN A METEOROLOGICAL
WIND TUNNEL OF SPILLS AT CHINA LAKE NAVAL WEAPONS CENTER, CALIFORNIA, U.S.
Coast Guard, Department of Transportation, Contract DOT CG-75279-A, March 1979,
CER78-79DEN-RNM41, 77p.
62. Meroney, R. N., Bouwmeester, R. J. B.,
Kothari, K. M. (1979), AN ALGORITHM TO ESTIMATE FIELD CONCENTRATIONS UNDER
NONSTEADY METEOROLOGICAL CONDITIONS FROM WIND TUNNEL EXPERIMENTS, Office of
Nuclear Regulatory Research, NRC Contract No. NRC-04-76-236, #3, June 1979,
CER78-79RJBB-RNM43 (NUREG/CR-1474).
63. Meroney, R. N., Kothari,* K.
M., and Peterka, J. A. (1979), STABLY STRATIFIED BUILDING WAKES, Office of
Nuclear Regulatory Research, NRC, Contract No. NRC-04-76-236, #3, July 1979,
CER78-79KMK-JAP-RNM65, 143pp. (NUREG/CR-1247).
64. Meroney, R. N. and Peterka, J. A. (1979)
, WIND-TUNNEL MEASUREMENTS OF DISPERSION AND TURBULENCE IN THE WAKES OF NUCLEAR
REACTOR PLANTS: FINAL REPORT, Office of
Nuclear Regulatory Research, NRC, Contract No. NRC-04-76-236, #3, December
1979, 53pp., CER79-80RNM-JAP32 (NUREG/CR-1475).
65. Meroney, R. N. and Kothari, K. M. (1979),
BUILDING EFFECTS ON NATIONAL TRANSONIC FACILITY EXHAUST PLUME, NASA,
66. Meroney, R. N., Chien,* H. C.,
and Sandborn, V. A. (1979), PHYSICAL MODELING OF THE WIND FIELD OVER KAHUKU
POINT, OAHU, HAWAII, DOE Contract No. DE-AS06-77ET20292, A004, FDDL Report CER79-80HCC-RNM-VAS25,
162pp.
67. Meroney, R. N., Kothari,* K.
M., and Peterka, J. A. (1979), NUCLEAR POWER PLANT BUILDING WAKE EFFECTS ON
ATMOSPHERIC DIFFUSION: Simulation in a
Wind Tunnel, EPRI, CER79-80KMK-RNM-JAP28, 110pp., Data Report CER79-80KMK-RNM-JAP46,
228pp.
68. Meroney, R. N. and Abarikwu,*
O. I. B (1979), DAIRY FARM WIND
GENERATOR MODEL, USDA/SEA/ARS Research Agreement No. S8-32U4-8-34,
CER79-80/OIA-RNM51, 118p.
69. Meroney, R. N., Kothari,* K.
M., and Peterka, J. A. (1980),
CONCENTRATION DATA FOR NUCLEAR POWER PLANT BUILDING WAKE EFFECTS ON
ATMOSPHERIC DIFFUSION: Simulation in
Wind Tunnel," Electric Power Research Institute, Palo Alto, California,
CER79-80KMK-RNM-JAP46.
70. Meroney, R. N. and Kothari,*
K. M. (1980), DISPERSION OF VAPOR FROM LNG SPILLS AT
71. Meroney, R. N., Neff, D. E., and Kothari,
K. M.(1980), THE BEHAVIOR OF LNG VAPOR CLOUDS:
Tests to Define the Size, Shape and Structure of LNG Vapor Clouds and
LNG Plume Interaction with Surface Obstacles, Annual Report 1980-1981, Gas
Research Institute, Chicago, Illinois, July 1980, GRI-79/0073, PB81-201907, 80pp.
72. Meroney, R. N., Li, W. W., and Peterka,
J. A. (1981), WIND TUNNEL STUDY OF THE GAS DISPERSION AROUND A MODEL CUBIC
BUILDING, Nuclear Regulatory Commission, CER81-82WWL-RNM-JAP8, July 1981,
122pp.
73. Meroney, R. N, Kothari,* K.
M., and Peterka, J. A. (1981), NUCLEAR POWER PLANT BUILDING WAKE EFFECTS ON
ATMOSPHERIC DIFFUSION: Simulation in a
Wind Tunnel, Electric Power Research Institute, Palo Alto, California, EPRI
Report NP-1891, June 1981, CER79-80KMK-RNM-JAP28, 109pp.
74. Meroney, R. N. and Kothari, K. M. (1981),
DISPERSION OF VAPOR FROM LNG SPILLS AT ENERGY TERMINAL SERVICE
CORPORATION: Simulation in a Wind
Tunnel, ETSC,
75. Meroney, R. N., (1981) REPORT OF
ACTIVITIES DURING TENURE OF ALEXANDER VON HUMBOLDT AWARD AS SENIOR VS.
SCIENTIST AT UNIVERSITY OF KARLSRUHE, BRD, Colorado State University Report
CER81-82RNM-3, July 1981, 12 pp.
76. Meroney, R. N. and Neff,* D.
E. (1981), THE BEHAVIOR OF LNG VAPOR
CLOUDS: WIND TUNNEL SIMULATION AT 40 M3 LNG SPILL TESTS AT CHINA LAKE NAVAL
WEAPONS CENTER, CALIFORNIA, for Gas Research Institute, Contract No.
5014-352-0203, Report GRI 80/0094, PB82-199027, July 1981, 155 pp.
CER-81-82-DEN-RNM-1.
77. Meroney, R. N. and Kothari, K. M. (1981),
DISPERSION OF VAPOR FROM LNG SPILLS AT ENERGY TERMINAL SERVICE
CORPORATION: RELEASES DURING STABLE
ATMOSPHERIC CONDITIONS, SIMULATION IN A WIND TUNNEL, for ETSC,
78. Meroney, R. N. and Kothari*, K. M.
(1981), LNG PLUME INTERACTION WITH SURFACE OBSTACLES, for Gas Research
Institute, Contract No. 5014-352-0203, Report GRI 80/0095, PB82-198995,
September 1981, 156 pp. CER81-82KMK-RNM22.
79. Meroney, R. N. and Kothari,*
K. M. (1982), ACCELERATED DILUTION OF LIQUIFIED NATURAL GAS PLUMES WITH FENCES
AND VORTEX GENERATORS, for Gas Research Institute, Contract No. 5014-352-0203,
Report GRI 81/0074, May 1982, 222 pp. CER81-82KMK-RNM79.
80. Meroney, R. N. and Neff,* D.
E. (1982), THE BEHAVIOR OF LNG VAPOR CLOUDS: Wind-Tunnel Tests on the Modeling
of Heavy Plume Dispersion, for Gas Research Institute, Contract No.
5014-352-0203, Report GRI 80/0145, March 1982, 120 pp. CER81-82DEN-RNM25.
81. Meroney, R. N. and Lohmeyer, A. (1982),
GRAVITY SPREADING AND DISPERSION OF DENSE GAS CLOUDS RELEASED SUDDENLY INTO A
TURBULENT BOUNDARY LAYER, for Gas Research Institute, Contract No.
5014-352-0203, Report GRI 81/0025, August 1982, 220 pp. CER82-83RNM-AL-7.
82. Meroney, R. N. (1982), REVIEW OF NINE
RURAL AIR QUALITY MODELS FOR AMS STEERING COMMITTEE, for Peer Review Panel AMS,
May 1982, 91 pp. CER81-82RNM-72.
83. Meroney, R. N. and Li,* W. W.
(1982), THE ESTIMATION OF ATMOSPHERIC DISPERSION AT NUCLEAR REACTOR PLANTS
UTILIZING REAL TIME ANEMOMETER STATISTICS, Nuclear Regulatory Commission, 72
pp. CER82-83WWL-RNM-1.
84. Meroney, R. N., Kothari, K. M., Neff, D.
E., Andreiev, G. (1983), MODEL STUDY OF
LIQUEFIED NATURAL GAS VAPOR CLOUD DISPERSION WITH WATER SPRAY CURTAINS, for
Factory Mutual Research Corporation, Contract No. 58837, March 1983,
CER82-83RNM-KMK-DEN-GA41, 217pp., also Appendix of FMRC Report to GRI, GRI
Report No. GRI-83/0019.
85. Meroney, R. N., Neff, D. E., and
Andreiev, G.* (1983), HEAT TRANSFER EFFECTS DURING COLD DENSE GAS
DISPERSION, for Gas Research Institute, Contract No. 5014-352-0203, Report GRI
83/0082, June 1983, CER83-84GA-DEN-RNM3, 200 pp., PB84-162999.
86. Meroney, R. N. and Neff, D. E.*
(1983), WIND-TUNNEL STUDY ON PLUME DISPERSION AT THE SAVANNAH RIVER PROJECT,
for E. I. Dupont Company, Savannah River Laboratory, South Carolina, December
1983, 123 pp. CER83-84DEN-RNM25,
87. Meroney, R. N. and Li, W.W.*
(1984), THE ESTIMATION OF ATMOSPHERIC DISPERSION AT NUCLEAR REACTOR PLANTS
UTILIZING REAL TIME ANEMOMETER STATISTICS - Final Report, Nuclear Regulatory
Commission, NRC Contract No. 04-81-202, Mod. 1, NUREG/CR-4072, July 1984, 244
pp. CER84-85RNM-WWL7.
88. Meroney, R.N. (1985), GUIDELINE FOR FLUID
MODELING OF LIQUEFIED NATURAL GAS CLOUD DISPERSION - Final Report for Gas
Research Institute, Contract No. 5083-252-0962, August 1985, 288 pp.
CER84-85RNM50. (Revised and published as two volumes - See 89 and 90).
89. Meroney, R.N. (1986), GUIDELINE FOR FLUID
MODELING OF LIQUEFIED NATURAL GAS CLOUD DISPERSION - Vol. I: Instruction Guide,
Final Report for Gas Research Institute, Contract No. 5083-252-0962, Report
GRI86/0102.1, May 1986, 57 pp., CER84-85RNM50a.
90. Meroney, R.N. (1986), GUIDELINE FOR FLUID
MODELING OF LIQUEFIED NATURAL GAS CLOUD DISPERSION - Vol. II: Technical Support Document, Final Report for
Gas Research Institute, Contract No. 5083-252-0962, Report GRI86/0102.2, May
1986, 262 pp., CER84-854RNM50b.
91. Meroney, R.N. and Neff, D.E.*
(1985), MEASUREMENTS IN A WIND TUNNEL OF
THE MODIFICATION OF MEAN WIND AND TURBULENCE CHARACTERISTICS DUE TO INDUCTION
EFFECTS NEAR WIND ROTORS, Final Report for Battelle, Pacific Northwest
Laboratories.. Contract No. M2931-A-X, October 1985, 141 pp, CER85-86DEN-RNM10.
92. Meroney, R.N. and Bienkiewicz,* WIND-TUNNEL
STUDY OF WESTILE BALLAST PAVER, Final Report to Westile, Inc., Denver,
Colorado, 90 pp. CER85-86BB-RNM13.
93. Meroney, R.N. (1986), WIND-TUNNEL
MODELING OF THE FLOW ABOUT BLUFF BODIES, Sonderforchungsbereich 210, University
of Karlsruhe, West Germany, July 1986, 40 pp., CEM86-87RNM48.
94. Meroney, R.N. (1986), WIND-TUNNEL
MODELING OF CONVECTIVE BOUNDARY LAYER, Sonderforforchungsbereich 210,
University of Karlsruhe, West Germany, July 1986, 37 pp., CEM86-87RNM49.
95. Meroney, R.N. and Neff, D.E.*
(1986), LNG VAPOR BARRIER AND OBSTACLE EVALUATION, WIND-TUNNEL PREFIELD TEST
RESULTS, for Lawrence Livermore Laboratory, Contract No. 8432705, September
1986, 183 pp., FMWEPP85-86RNM3.
96. Meroney, R.N., FLUID MECHANICS AND WIND
ENGINEERING PROGRAM, DEPARTMENT OF CIVIL ENGINEERING, 1987 TO 1992: Program Objectives, Activities, Resources and
Plans, Colorado State University, January 1987, 26 pp., CEM86-87RNM-1.
97. Meroney, R.N. and Bienkiewicz, B.*
(1987), WIND-TUNNEL STUDY OF ROOFBLOK BALLAST BLOCK FOR HIGH WINDS, for
Roofblok, Inc., CSU Project 2-96960, January 1987. 39 pp. FMWER86-87BB-RNM-1.
98. Meroney, R.N. and Davidson, J.H.*
(1987), WIND-TUNNEL SIMULATION OF THE JOHNSON MATTHEY INC. PLACERITA SPARGER
SYSTEM, for Johnson Matthey, Inc., Wayne, Pennsylvania, CSU Contract No.
297030, May 1987, 102 pp. FMWER
86-87JHD-RNM2.
99. Meroney, R.N., Ewald, R.L., Shin, S.H.,
and Neff, D.E. (1988), WIND-TUNNEL STUDIES OF CERTAIN METEOROLOGICAL TOWER
SITING CHARACTERISTICS AT THE JAMES A. FITZPATRICK NUCLEAR POWER STATION, for
New York Power Authority, White Plains, New York, CSU Contract No. 296920,
February 1988, 206 pp. CER87-88RNM-RLE-SHS-DEN1.
100. Meroney, R.N. and Neff, D.E.*
(1987), PLUME BEHAVIOR FROM TALL STACKS AT SAVANNAH RIVER LABORATORY, AIKEN,
SOUTH CAROLINA, for E.I. Dupont Company, Aiken, South Carolina, CSU Contract
No. 53-6439, July 1987, 122 pp. CER87-88DEN-RNM2.
101. Meroney, R.N. (editor), Proceedings of
SEMINAR/WORKSHOP ON WIND ENGINEERING: THE PAST TO THE FUTURE, Colorado State
University, Fort Collins, 4-6 June 1987, 168 pp, CER87-88RNM-3.
102. Meroney, R.N., Neff, D.E., Shin, S.H.,
Steidle, T.C., Tan, T.Z., and Wu, G. (1988), ANALYSIS OF VAPOR BARRIER
EXPERIMENTS TO EVALUATE THEIR EFFECT AS A MEANS TO MITIGATE HF CLOUD
CONCENTRATIONS, for EXXON Research and Engineering, Florham Park, NJ, CSU No.
29-7330, December 1988, 194 pp.
CER88-89RNM-DEN-SHS-TCS-TZT-GW-1.
103. Meroney, R.N. and Neff, D.E.*
(1988), DOWNWIND AND LATERAL WIND TURBINE WAKE EFFECTS ON WIND TURBINE
PERFORMANCE, for U.S. Windpower, Livermore, California, CSU Contract No.
29-7210, December 1988, 98 pp.,CER88-89DEN-RNM-4.
104. Meroney, R.N. and Tan, Z.T.* (1988),
WIND TUNNEL EVALUATION OF THE PERFORMANCE OF THE SKYBUDDY BALLOON SYSTEM, for
Radarfind, Inc., Denver, Colorado, CSU Contract No. 29-7500, December 1988, 40
pp., CER88-89TZT-RNM-5.
105. Meroney, R.N., Neff, D.E.*, and
Tan, Z.T (1988)., FLUID MODELING OF EXHAUST GAS DISPERSION FROM THE PARCEL 7
VENTILATION SITE, CENTRAL ARTERY/THIRD HARBOR TUNNEL PROJECT, for
Bechtel/Parsons Brinkerhoff, Boston, Massachusetts, CSU Contract No. 29-7360,
December 1988, 82 pp. CER88-89DEN-TZT-RNM-6.
106. Meroney, R.N., Neff, D.E.*, and
Tan, Z.T. (1988), FLUID MODELING OF EXHAUST GAS DISPERSION FROM THE
BOSTON-EDISON VENTILATION SITE, CENTRAL ARTERY THIRD HARBOR TUNNEL PROJECT, for
Bechtel/Parsons Brinkerhoff, Boston, Massachusetts, CSU Contract No. 29-7360,
December 1988, 74 pp. CER88-89DEN-TZT-RNM-7.
107. Meroney, R.N., Venkateswarlu, B., Cheng,
E.D.H., and Lee, B.E. (1988) , EXTREME-WIND HAZARD WORKSHOP REPORT, Final
Report on U.S. Asia Conference on
Engineering for Mitigating Natural Hazards Damage, (A.N. L. Chiu, editor),
National Science Foundation, September 1988, pp. 19-27.
108. Meroney, R.N. and Tan, T.Z.* (1989),
WIND TUNNEL STUDIES TO MITIGATE SNOWDRIFT INTO ROOFTOP AIR-HANDLING COURTS ON
UNIVERSITY OF COLORADO HEALTH SCIENCES CENTER, Physical Plant and Maintenance
Department, Univ. of Colorado Health Sciences Center, Denver, Colorado, October
1989, 61 pp. CER88-89TZT-RNM-15.
109. Meroney, R.N. and Tan, T.Z.*
(1989), FLUID MODELING OF EXHAUST GAS DISPERSION FOR THE UNIVERSITY OF COLORADO
HEALTH SCIENCES CENTER, Physical Plant and Maintenance Department, Univ. of
Colorado Health Sciences Center, Denver, Colorado, October, 1989, 54 pp.
CER88-89TZT-RNM-17.
110. Meroney, R.N. and Shin, S.H.*, and
Neff, D.E. (1990), LNG VAPOR BARRIER AND OBSTACLE EVAULATION: WIND-TUNNEL SIMULATION OF 1987 FALCON SPILL
SERIES, DATA REPORT, Gas Research
Institute, Chicago, Illinois, August, 1990, 302 pp. CER89-90-SHS-RNM-DEN-11
111. Meroney, R.N. and Neff, D.E.*, and
Tan, T.Z. (1990), WIND TUNNEL STUDY OF TRANSPORT AND DISPERSION DOWNWIND OF THE
STRINGFELLOW HAZARDOUS WASTE SITE, RIVERSIDE COUNTY, CALIFORNIA, Milberg,
Weiss, Bershad, Specthrie and Lerach, San Diego, CA, 67 pp. CER89-90DEN-TZT-RNM-10.
112. Meroney, R.N. (1990), "Review and
Classification of Complex Terrain Models for Use with Integrated Pest
Management Program Spray Models," Appendix B of SELECTION AND VERIFICATION
OF COMPLEX TERRAIN WIND FLOW MODEL FOR SPRAY TRANSPORT: Briefing Paper and
Progress Report, U.S. Dept. of Agriculture, Forest Service, Report 5E52P29,
July 1990, pp. B-1 to B-22. (See
CEM89-90-RNM-1).
113. Meroney, R.N. and Parce, D.K.*
(1990), FLUID MODELING OF EXHAUST GAS DISPERSION FOR THE UNIVERSITY OF COLORADO
SCHOOL OF PHARMACY, Physical Plant and Maintenance Department, Univ. of
Colorado Health Sciences Center, Denver, Colorado, November 1990, 50 pp.
CER90-91DKP-RNM-8.
114. Meroney, R.N. and Shin, S.H.*
(1990), ATMOSPHERIC DISPERSION ABOUT A HEAVY GAS VAPOR DETENTION SYSTEM, Gas
Research Institute, Chicago, Illinois, February 1991, 172 pp.
CER90-91SHS-RNM-11.
115. Meroney, R.N. (1992), WIND-TUNNEL MODELLING
OF HILL AND VEGETATION INFLUENCE ON WIND POWER AVAILABILITY: TASK 1:
LITERATURE REVIEW, Prepared for Meteorological Services, U.S. Windpower,
Inc., Livermore, CA, CSU Contract No. 298610, November 1992, 123 pp.
CER92-93-RNM-1.
116. Meroney, R.N., El-Badry, H.*, and
Neff, D.E. (1993), PHYSICAL AND NUMERICAL MODELING TO EVALUATE ASD EXHAUST
DESIGN FOR ACCEPTABLE RE-ENTRAINMENT AND DISPERSION IN HOUSES, Prepared for
S.B. Cohen, Inc. and AEERL, Environmental Protection Agency, 165 pp.
117. Meroney, R.N., Hanna, S.*, and
Britter, R.E. (1993), MODELING OF FINITE DURATION RELEASES OF HAZARDOUS GASES
TO THE ATMOSPHERE - A REVIEW OF CURRENT RESEARCH AND A PRESENTATION OF A
PROGRAM FOR FUTURE RESEARCH. Sigma
Research, Inc.
118. Meroney, R.N., Neff, D.E.*, and
El-Badry, H. (1994), PHYSICAL AND NUMERICAL MODELING OF ASD EXHAUST DISPERSION
AROUND HOUSES, U.S. Environmental Protection Agency Report EPA-600/R-94-115,
Prepared for Office of Radiation and Indoor Air, 210 pp. July 1994,
EPA-600/R-94-115.
119. Meroney, R.N., Rafailidis, S., and Pavageau,
M. (1994), SUMMARY AND DISCUSSION OF THE FINDINGS FROM THE
MERONEY-PAVAGEAU-RAFAILIDIS WIND TUNNEL TESTS OF APRIL-JUNE 1994,
Meteorologisches Institut,
120. Meroney, R.N.
and Neff, D.E.* (1995), WIND ENGINEERING STUDY OF GEORGETOWN FACTORY
STORES, for Chandler Properties,
Newton, MA, 54 pp., CER94-95-DEN-RNM-2.
121. Meroney, R.N.
and Leitl, B.* (1995), WIND TUNNEL MEASUREMENTS OF TRANSMISSION
CABLE DRAG, for Stone and Webster, Inc.
122. Meroney, R.N.
and Neff, D.E.* (1995), WIND TUNNEL GOOD ENGINEERING STACK HEIGHT
STUDY OF THE FCC COB STACK AT THE BILLINGS REFINERY, for Exxon Research and
Engineering Company, Florham Park, New Jersey, 41 pp.
123. Meroney,
R.N. and Mehta, K.C. (Editors) (1995), CSU/TTU COOPERATIVE PROGRAM IN WIND
ENGINEERING: Final Report for the National Science Foundation, Natural and
Manmade Hazards Program,
124. Meroney, R.N. and Mehta, K.C. (Editors)
(1995), CSU/TTU COOPERATIVE PROGRAM IN WIND ENGINEERING: PROGRESS REPORT FOR
TECHNICAL ASSESSMENT AND ADVISORY COUNCIL, 13-14 October 1995,
125 Meroney, R.N. and Mehta, K.C. (1996), FIVE YEARS OF ACHIEVEMENT UNDER THE
CSU/TTU COOPERATIVE PROGRAM IN WIND ENGINEERING: (Sponsored by the National
Science Foundation) An Executive Summary Report, Colorado State University and
Texas Tech University, Fort Collins, CO. and Lubbock, TX, 50 pp.
126.
Meroney, R.N. and Mehta, K.C. (Editors)
(1996), CSU/TTU COOPERATIVE PROGRAM IN WIND ENGINEERING: PROGRESS REPORT FOR
TECHNICAL ASSESSMENT AND ADVISORY COUNCIL, 25-26 October 1996,
127.
Meroney, R.N. and Mehta, K.C. (Editors)
(1997), CSU/TTU COOPERATIVE PROGRAM IN WIND ENGINEERING: PROGRESS REPORT FOR
TECHNICAL ASSESSMENT AND ADVISORY COUNCIL,31 Oct - 1 Nov, 1997,
128.
Meroney, R.N. and Mehta, K.C.
(Editors). (1998), COOPERATIVE PROGRAM IN WIND ENGINEERING Newsletter, Spring
1998, Volume 6, Number 1, 8 pp.
129.
Meroney,
R.N. and Mehta, K.C. (Editors). (1998), COOPERATIVE PROGRAM IN WIND ENGINEERING
Newsletter, Fall 1998, Volume 6, Number 2, 8 pp.
130.
Meroney, R.N. and Mehta, K.C.
(Editors). (1998), CSU/TTU COOPERATIVE PROGRAM IN WIND ENGINEERING: PROGRESS
REPORT FOR TECHNICAL ASSESSMENT AND ADVISORY COUNCIL, 25-26 September 1998,
131. Meroney, R.N. and Mehta, K.C. (Editors).
(2000), CSU/TTU COOPERATIVE PROGRAM IN WIND ENGINEERING: PROGRESS REPORT FOR
TECHNICAL ASSESSMENT AND ADVISORY COUNCIL, Spring 2000,
132.
Meroney, R.N., Banks, D.*, and Petersen,
R. (2000), CFD ANALYSIS OF AIR MOVEMENT IN SPRAGUE HALL BL3 ANIMAL HOLDING
ROOM, Letter Report to Mr. Bob Tomlinson, Bechard Long & Associates, 10670
Treena, Suite 208, San Diego, CA 92131, (CPP project 00-2021), October 2000, 7
pp.
133.
Meroney, R.N. Banks, D.*, and Petersen,
R.L. (2000), RESULTS OF CFD SIMULATIONS OF A FIRE IN THE ATRIUM OF U.C.
BERKELEY STANLEY HALL REPLACEMENT PROJECT, Letter Report to Ms. Renee Kajimoto,
Zmmer Gunsul Fasca, Portland, OR, CPP Inc., December 21, 2000, 22 pp.
134.
Meroney, R.N. and Mehta, K.C. (Editors)
(2001), CSU/TTU COOPERATIVE PROGRAM IN WIND ENGINEERING: FINAL REPORT TO NSF,
Civil Engineering, Colorado State University,
Fort Collins, CO., June 30, 2001,
pp.
135.
Meroney, R.N., Neff, D.E.*, Chang,
C.H., and R. Pradoto. (2001), WIND TUNNEL STUDY OF CLADDING LOADING AND
PEDESTRIAN WIND ENVIRONMENT FOR BUILDING 67, DENVER FEDERAL CENTER, Final
Report for Oz Architecture, Denver, CO, September 2001, 118 pp.
136.
Meroney, R.N., Banks, D.*, and
Petersen, R.L. (2001), COMPUTATIONAL FLUID DYNAMICS SIMULATION OF AIR MOVEMENT
FOR ANIMAL HOLDING ROOM BAYER BUILDING B31 RENOVATION, CPP Project 01-2242,
Prepared for Bayer Corporation, West Haven CT, CPP Inc., August 24, 2001, 17
pp.
137.
Meroney, R.N., Banks, D.*, and Petersen, R.L.
COMPUTATION FLUID DYNAMIC SIMULATIONS: Atrium Smoke Control Analysis,
University of Cincinnati MSB Rehabilitation and Expansion, Final Report, Cermak
Peterka Petersen, Inc, and Wind Engineering Software, Fort Collins, CO,
November, 2002, 34 pp.
138.
Meroney, R.N. and Neff, D.E. *, WIND
TUNNEL STUDY OF POWERGUARD RT GEN II ARRAYS, Final Report for PowerLight
Corporation, Berkeley, CA, Wind Engineering and Fluids Laboratory, Civil
Engineering, Colorado State University, Fort Collins, CO., December, 2002, 56
pp.
139.
Meroney, R.N. MRI HOSELESS CABLE-VAC SLUDGE COLLECTOR: CFD
and Minor Pipe Flow Analysis of Orifice Disk Balancing System, Meurer Research, Inc., Golden, CO, August 2003, 29 pp. (Proprietary)
140.
Meroney, R.N., MRI, GEWE & TROUGH
STYLE PLATE COLLECTORS: 2-d CFD Analysis
of Flow Through 3 Styles of Plate Collectors, Meurer Research, Inc., Golden,
CO, November 2003, 49 pp. (Proprietary)
141.
Meroney, R.N., MRI, GEWE & TROUGH STYLE PLATE COLLECTORS: 3-d CFD Analysis of Flow Through 3 Styles of
Plate Collectors, Meurer Research, Inc., Golden, CO, November 2003, 55 pp. (Proprietary)
142.
Meroney, R.N., PREDICTION OF THE IMPACT
OF COOLING TOWER DRIFT NEAR BEVERLY HILLS HIGH SCHOOL, Final Report , Baron
& Budd, PC, Dallas, TX, Wind Engineering and Fluids Laboratory, Civil
Engineering, Colorado State University, Fort Collins, CO, January 2005, 55 pp.
143.
Meroney, R.N., PREDICTION OF THE IMPACT OF COOLING TOWER
DRIFT NEAR BEVERLY HILLS HIGH SCHOOL, Addendum , Baron & Budd, PC, Dallas,
TX, Wind Engineering and Fluids Laboratory, Civil Engineering, Colorado State University,
Fort Collins, CO, March 2005, 11 pp.
144.
Meroney, R.N., FLOW BEHAVIOR ABOUT HACH COMPANY AV PROBE
INSTALLED IN PIPE SHAPED OPEN CHANNELS, Hach Company,
145.
Meroney, R.N., DECLARATION: Related to Air Emissions from
the National Electric Coil Plant, Dayhoit, KY:
Charles W. Adams, Jr. et al., Plaintiffs, v. Cooper Industries and
McGraw Edison Co, Defendants, C.A. No. 5:03-CV-476-JBC, Baron & Budd, PC,
Dallas, TX, March 2007, 61 pp. (Proprietary)
146.
Meroney, R.N. EXPERT REPORT: Related to Litigation Concerning Emissions
from Kerr-McGee Wood Treating Facility,
147.
Meroney, R.N., CFD SIMULATION OF ANAEROBIC DIGESTER
MIXING: Analysis of 100 ft Diameter Tank
with 4 External Draft Tube Mixers, Olympic Technologies, Inc.,
148.
Meroney, R.N. and Derickson, R. COMPUTATIONAL FLUID DYNAMICS (CFD) STUDY OF
THE SMOKE EXHAUST FOR THE ATRIUM IN THE
149.
Meroney, R.N. MIXER ARRANGEMENT EFFECTS ON TANK DEPOSITION
IN AN ANAEROBIC DIGESTER, Prepared for Wenck Associates, Inc.,
150.
Meroney, R.N. and Derickson, R. COMPUTATIONAL FLUID DYNAMIC (CFD) STUDY IN
SUPPORT OF REPLACING AND UPGRADING VENTILATION AND EXHAUST IN BUILDING 7 AT THE
PICATINNY ARSENAL, NEW JERSEY, prepared for Architectural Energy Corporation,
a.
100 m Firing Range 3d Simulation Rev 1
(30 pp)
b.
100 m Firing Range 3d Simulation Rev 2
(32 pp)
c.
100 m Firing Range 3d Simulation Rev 3
(37 pp)
d.
100 m
e.
100 m
f.
300 m Firing Range 3d Simulation Rev 1
(34 pp)
g.
300 m Firing Range 3d Simulation Rev 2
(31 pp)
h.
300 m Firing Range 3d Simulation Rev 3
(33 pp)
i.
300 m
j.
300 m
k.
l.
Water Trap Simulation (11 pp)
m. Exterior
of Range Buildings (email 6 slides)
151 Meroney, R.N. COMPUTATIONAL FLUID DYNAMIC
(CFD) STUDY IN SUPPORT OF REPLACING AND UPGRADING VENTILATION AND EXHAUST IN
BUILDING 7 AT THE PICATINNY ARSENAL, NEW JERSEY, Revised Tunnel Description 300
m Firing Range, December 2010