CSU IAC Summary of Results - FFY 2002

October 2001 - September 2002


Manufacturers Served

20

Number of Recommendations

129 ARs

Total Implemented Cost Savings

Available 7/2003

Total Recommended Cost Savings

$9,065,756/yr

Actual Implementation Cost

Available 7/2003

Total Estimated Implementation Cost

$54,407,718

Average Payback Period

6.00 years

Implementation Rate for Period

Available 7/2003


 
 

Energy Type 

Recommended 
Savings 

 

Recommended 
Cost Savings 

 

Electrical Consumption

132,785,233

kWh/yr

$6,803,892

/yr

Electrical Demand

37,135

kW-months/yr

$316,792

/yr

Other Electrical Fees

N/A

 

$0

/yr

Natural Gas

18,246

MMBtu/yr

$80,470

/yr

L.P.G.

49,936

MMBtu/yr

$266,030

/yr

#1 Fuel Oil

0

MMBtu/yr

$0

/yr

#2 Fuel Oil

0

MMBtu/yr

$0

/yr

#4 Fuel Oil

0

MMBtu/yr

$0

/yr

#6 Fuel Oil

0

MMBtu/yr

$0

/yr

Coal

0

MMBtu/yr

$0

/yr

Wood

0

MMBtu/yr

$0

/yr

Paper

0

MMBtu/yr

$0

/yr

Other Gas

0

MMBtu/yr

$0

/yr

Other Energy

0

MMBtu/yr

$0

/yr

Water Disposal

23,055,000

gallons/yr

$7,090

/yr

Other Liquid (nonhaz)

56,400

gallons/yr

$8,330

/yr

Other Liquid (haz)

561

gallons/yr

$6,100

/yr

Solid Waste (nonhaz)

34,100

pounds/yr

$33,030

/yr

Solid Waste (haz)

0

pounds/yr

$0

/yr

Gaseous Waste

0

pounds/yr

$0

/yr

Personnel Changes

N/A

 

$179,749

/yr

Administrative Costs

N/A

 

$1,025,775

/yr

Primary Raw Material

N/A

 

$0

/yr

Ancillary Material Cost

N/A

 

$78,688

/yr

Water Consumption

N/A

 

$2,960

/yr

Primary Product

N/A

 

$256,850

/yr

Byproduct Production

N/A

 

$0

/yr

TOTALS

 

 

$9,065,756