Manufacturers Served |
25 |
|
Number of Recommendations |
167 ARs |
|
Total Recommended Cost Savings |
$4.25 Million/yr |
|
Total Estimated Implementation Cost |
$5.62 Million |
|
Average Payback Period |
1.32 years |
|
Implementation Rate for Period |
38% |
|
Energy Type |
Recommended |
|
Recommended |
|
|---|---|---|---|---|
|
Electrical Consumption |
19,733 |
MMBtu/yr |
$222,580 |
/yr |
|
Electrical Demand |
13,525 |
kW-months/yr |
$162,641 |
/yr |
|
Other Electrical Fees |
N/A |
|
$0 |
/yr |
|
Natural Gas |
9,003 |
MMBtu/yr |
$33,160 |
/yr |
|
L.P.G. |
0 |
MMBtu/yr |
$0 |
/yr |
|
#1 Fuel Oil |
0 |
MMBtu/yr |
$0 |
/yr |
|
#2 Fuel Oil |
(3,394) |
MMBtu/yr |
($27,330) |
/yr |
|
#4 Fuel Oil |
0 |
MMBtu/yr |
$0 |
/yr |
|
#6 Fuel Oil |
0 |
MMBtu/yr |
$0 |
/yr |
|
Coal |
0 |
MMBtu/yr |
$0 |
/yr |
|
Wood |
0 |
MMBtu/yr |
$0 |
/yr |
|
Paper |
0 |
MMBtu/yr |
$0 |
/yr |
|
Other Gas |
0 |
MMBtu/yr |
$0 |
/yr |
|
Other Energy |
0 |
MMBtu/yr |
$0 |
/yr |
|
Water Disposal |
11,344,360 |
gallons/yr |
$9,830 |
/yr |
|
Other Liquid (nonhaz) |
7,180 |
gallons/yr |
$19,930 |
/yr |
|
Other Liquid (haz) |
6,946 |
gallons/yr |
$36,980 |
/yr |
|
Solid Waste (nonhaz) |
202,862 |
pounds/yr |
$19,320 |
/yr |
|
Solid Waste (haz) |
77,238 |
pounds/yr |
$4,780 |
/yr |
|
Gaseous Waste |
11,099 |
pounds/yr |
$0 |
/yr |
|
Personnel Changes |
N/A |
|
$317,330 |
/yr |
|
Administrative Costs |
N/A |
|
$233,320 |
/yr |
|
Primary Raw Material |
N/A |
|
$17,980 |
/yr |
|
Ancillary Material Cost |
N/A |
|
$193,320 |
/yr |
|
Water Consumption |
N/A |
|
$12,030 |
/yr |
|
Primary Product |
N/A |
|
$2,995,370 |
/yr |
|
Byproduct Production |
N/A |
|
$0 |
/yr |
|
TOTALS |
|
|
$4,251,901 |
/yr |