CSU IAC Summary of Results - FFY 1998

October 1997 - September 1998


Manufacturers Served 25
Number of Recommendations 164 ARs
Total Recommended Cost Savings $3.50 Million/yr
Total Estimated Implementation Cost $1.82 Million
Average Payback Period 0.52 years
Implementation Rate for Period 45%

 
 
Energy Type  Recommended 
Savings 
Recommended 
Cost Savings 
Electrical Consumption 4,943 MMBtu/yr $37,580 /yr
Electrical Demand 5,994 kW-months/yr $56,238 /yr
Other Electrical Fees N/A $0 /yr
Natural Gas 7,130 MMBtu/yr $25,540 /yr
L.P.G. 0 MMBtu/yr $0 /yr
#1 Fuel Oil 0 MMBtu/yr $0 /yr
#2 Fuel Oil 0 MMBtu/yr $0 /yr
#4 Fuel Oil 0 MMBtu/yr $0 /yr
#6 Fuel Oil 0 MMBtu/yr $0 /yr
Coal 0 MMBtu/yr $0 /yr
Wood 0 MMBtu/yr $0 /yr
Paper 0 MMBtu/yr $0 /yr
Other Gas 0 MMBtu/yr $0 /yr
Other Energy 221 MMBtu/yr $6,010 /yr
Water Disposal 9,997,200 gallons/yr $21,737 /yr
Other Liquid (nonhaz) 5,039 gallons/yr $13,360 /yr
Other Liquid (haz) 2,970 gallons/yr $19,830 /yr
Solid Waste (nonhaz) 13,415,370 pounds/yr $149,766 /yr
Solid Waste (haz) 26,560 pounds/yr $45,816 /yr
Gaseous Waste 15,030 pounds/yr $0 /yr
Personnel Changes N/A $607,370 /yr
Administrative Costs N/A $1,160,980 /yr
Primary Raw Material N/A $68,250 /yr
Ancillary Material Cost N/A $77,294 /yr
Water Consumption N/A $36,516 /yr
Primary Product N/A $1,171,470 /yr
Byproduct Production N/A $0 /yr
TOTALS $3,497,757 /yr