Manufacturers Served |
25 |
|
Number of Recommendations |
176 ARs |
|
Total Recommended Cost Savings |
$4.51 Million/yr |
|
Total Estimated Implementation Cost |
$1.90 Million |
|
Average Payback Period |
0.42 years |
|
Implementation Rate for Period |
44% |
|
Energy Type |
Recommended |
Recommended |
||
|---|---|---|---|---|
|
Electrical Consumption |
6,227 |
MMBtu/yr |
$39,185 |
/yr |
|
Electrical Demand |
4,910 |
kW-months/yr |
$58,181 |
/yr |
|
Other Electrical Fees |
N/A |
$0 |
/yr |
|
|
Natural Gas |
8,331 |
MMBtu/yr |
$26,690 |
/yr |
|
L.P.G. |
0 |
MMBtu/yr |
$0 |
/yr |
|
#1 Fuel Oil |
0 |
MMBtu/yr |
$0 |
/yr |
|
#2 Fuel Oil |
0 |
MMBtu/yr |
$0 |
/yr |
|
#4 Fuel Oil |
0 |
MMBtu/yr |
$0 |
/yr |
|
#6 Fuel Oil |
0 |
MMBtu/yr |
$0 |
/yr |
|
Coal |
0 |
MMBtu/yr |
$0 |
/yr |
|
Wood |
0 |
MMBtu/yr |
$0 |
/yr |
|
Paper |
0 |
MMBtu/yr |
$0 |
/yr |
|
Other Gas |
0 |
MMBtu/yr |
$0 |
/yr |
|
Other Energy |
201 |
MMBtu/yr |
$1,870 |
/yr |
|
Water Disposal |
5,130,670 |
gallons/yr |
$27,340 |
/yr |
|
Other Liquid (nonhaz) |
18,211 |
gallons/yr |
$2,053 |
/yr |
|
Other Liquid (haz) |
5,921 |
gallons/yr |
$24,456 |
/yr |
|
Solid Waste (nonhaz) |
943,270 |
pounds/yr |
$37,630 |
/yr |
|
Solid Waste (haz) |
76,402 |
pounds/yr |
$16,064 |
/yr |
|
Gaseous Waste |
1,106,250 |
pounds/yr |
$65,520 |
/yr |
|
Personnel Changes |
N/A |
($312,710) |
/yr |
|
|
Administrative Costs |
N/A |
$3,600 |
/yr |
|
|
Primary Raw Material |
N/A |
$18,450 |
/yr |
|
|
Ancillary Material Cost |
N/A |
$193,891 |
/yr |
|
|
Water Consumption |
N/A |
$9,770 |
/yr |
|
|
Primary Product |
N/A |
$3,824,170 |
/yr |
|
|
Byproduct Production |
N/A |
$476,870 |
/yr |
|
|
TOTALS |
$4,513,030 |
/yr |