CSU IAC Summary of Results - FFY 1997

October 1996 - September 1997


Manufacturers Served

25

Number of Recommendations

176 ARs

Total Recommended Cost Savings

$4.51 Million/yr

Total Estimated Implementation Cost

$1.90 Million

Average Payback Period

0.42 years

Implementation Rate for Period

44%

 

 

Energy Type 

Recommended 
Savings 

Recommended 
Cost Savings 

Electrical Consumption

6,227

MMBtu/yr

$39,185

/yr

Electrical Demand

4,910

kW-months/yr

$58,181

/yr

Other Electrical Fees

N/A

$0

/yr

Natural Gas

8,331

MMBtu/yr

$26,690

/yr

L.P.G.

0

MMBtu/yr

$0

/yr

#1 Fuel Oil

0

MMBtu/yr

$0

/yr

#2 Fuel Oil

0

MMBtu/yr

$0

/yr

#4 Fuel Oil

0

MMBtu/yr

$0

/yr

#6 Fuel Oil

0

MMBtu/yr

$0

/yr

Coal

0

MMBtu/yr

$0

/yr

Wood

0

MMBtu/yr

$0

/yr

Paper

0

MMBtu/yr

$0

/yr

Other Gas

0

MMBtu/yr

$0

/yr

Other Energy

201

MMBtu/yr

$1,870

/yr

Water Disposal

5,130,670

gallons/yr

$27,340

/yr

Other Liquid (nonhaz)

18,211

gallons/yr

$2,053

/yr

Other Liquid (haz)

5,921

gallons/yr

$24,456

/yr

Solid Waste (nonhaz)

943,270

pounds/yr

$37,630

/yr

Solid Waste (haz)

76,402

pounds/yr

$16,064

/yr

Gaseous Waste

1,106,250

pounds/yr

$65,520

/yr

Personnel Changes

N/A

($312,710)

/yr

Administrative Costs

N/A

$3,600

/yr

Primary Raw Material

N/A

$18,450

/yr

Ancillary Material Cost

N/A

$193,891

/yr

Water Consumption

N/A

$9,770

/yr

Primary Product

N/A

$3,824,170

/yr

Byproduct Production

N/A

$476,870

/yr

TOTALS

$4,513,030

/yr