Photos of constructed wetlands treating graywater at CSU west campus
Planting the free water surface wetland (Summer 2007)
Planting the subsurface wetland (Summer 2007)
 
500 gallon tank filled with graywater from dormitories
Monitoring equipment inside manhole
 
Free water surface wetland in operation
Subsurface wetland in operation
Photos Provided by JesseSpeer.com